Structural Steel for United States projects, made in India

What it takes to land structural steel on a United States site: the port they clear through, the standards a consultant will hold them to, and the paperwork that has to travel with them.

01Route and compliance

Getting structural steel into United States

American buyers rarely doubt Indian capacity. They doubt whether the paperwork survives an ASTM review, which is a fair doubt, because plenty of it does not. We galvanize to ASTM A123 and ship the mill test certificates with the container, so the check happens on your desk instead of on trust.

Port of entry

Port of Houston, TX

Also cleared through Port of Los Angeles / Long Beach, CA, Port of Newark, NJ.

Shipped FOB, CIF, CFR.

Standards that apply here

  • ASTM A123
  • ASTM A36
  • NEMA VE-1
  • UL Listed
  • ISO 9001:2015
  • IS 2062
  • IS 800
  • EN 1090
  • AWS D1.1

Every shipment travels with mill test certificates against the grade specified on your order.

Who buys this in United States

Oil & Gas · Solar & Renewable Energy · Data Centres · Automotive & CNC · Construction · Utilities & Power

Trade picture

USA is the #1 importer of steel structures from India. 54% share, 434 shipments under HSN 7308. #1 for solar module mounting structures. CNC cables grew at 44% CAGR FY17–FY24.

02The range

Custom Structural Steel Work

Heavy structural fabrication, built-up columns and beams, plate girders, gussets, base plates and brackets, welded by qualified WPS, fit-checked and finished by galvanizing or paint to project specification.

05Also shipped to this market

Other lines going into United States

06Questions buyers ask

Structural Steel into United States — the questions that come up

Answered by the people who make the product, not a sales desk.

Standard built-up sections and brackets typically run 6 to 8 weeks from drawing approval to shipment, depending on total tonnage and welding complexity; heavy plate girders or large project quantities extend this further. Structural drawing approval is usually the critical-path item, so get this finalized early in project planning.

Hot-dip galvanizing suits outdoor, long-service structures where decades of maintenance-free corrosion protection matters most. Epoxy/PU painting is common where a specific safety colour code is required, for indoor structures, or where the structure's size exceeds practical galvanizing bath dimensions, very large plate girders sometimes fall into this category. Confirm your galvanizing bath size constraints against your largest fabricated piece early in design.

Ask for their welding procedure qualification records, crane or handling capacity for heavy pieces, and a reference project of comparable scale and complexity. Find out whether cutting, forming and welding are all in-house. A fabricator who subcontracts heavy welding to unknown third parties can't guarantee consistent quality across your order.

Yes. Building to IS 800/IS 2062 is standard for Indian fabricators, who can also reference EN 1090, the European structural steelwork execution standard, or AWS D1.1, the American welding code, for export projects. Confirm which code governs your project's design and specify it explicitly in the enquiry.

Plate UT before fabrication, fit-up checks before welding, visual on every weld, MPI/UT on critical welds (to the project's NDE schedule), galvanizing thickness on every member, and dimensional check before painting. Reports are batch-linked.

Request a Quotation

Send us the structural steel spec for your United States job.

Drawings, a BOQ line, or the standard you have been given. You will get back specification, finish, lead time and a landed price to Port of Houston.

  • MTC · COO · inspection reports
  • ±0.01 mm precision · in-house QA
  • FOB · CIF · CFR to all major ports

Trade updates, new product lines, export schedules.

One email when it matters. No marketing noise.

Unsubscribe any time · No spam · Vajra International Exports